Tuesday, July 28, 2009
Monday, July 20, 2009
Step 1 5/8
Thursday, July 16, 2009. It is over 90* out, no shade, no breeze.
This is the mountain of concrete I have to work with.
Most chunks are 4-8 feet long and wide. So, I just started by stacking the pieces that were small enough for me to move.
This is the mountain of concrete I have to work with.
Most chunks are 4-8 feet long and wide. So, I just started by stacking the pieces that were small enough for me to move.
Very Hot!
With no breeze.
With no breeze.
With no shade.
But I keep on working!
Doesn't look like much but it was hard work!
Doesn't look like much but it was hard work!
Over 90* again.
No breeze.
No shade.
This time I have a sledgehammer!
Which actually makes life easier because now I can make the chunks the right size.
Wednesday, July 1, 2009
Step1 3/4
We have been on craigslist and calling everyone we know, but no rocks. Mom said if we have to buy them it will take us way out of budget (NONE) so, now what to do? The last time through craigslist, we saw an add for concrete chunks. Now that would work too. Mom remembered when we were at Miss Jodys' house there were giant slabs of concrete in the field. One call later, we were headed out to Miss Jody's place. Her husband told us he is doing a construction job where he can get us dump truck loads of concrete. Since he is in construction, he took a look at our plans and said that the concrete would work perfectly. Then he said that he could also bring us fill dirt to level the area that I am building the fire pit on. FREE!!! So, now we have the fill dirt and the Concrete coming this week and it is all FREE! That makes life easy.